Construction

Three phases · 2026–2029

Works are underway. Pile drilling finished on 7 August 2026. Foundations are planned for September.

Timeline

  1. 01

    Phase 1 · 47 apartments

    Start June 2026. Ready Q1 2027 through July 2027.

  2. 02

    Phase 2 · 94 apartments

    Planned readiness in 2028.

  3. 03

    Phase 3 · 86 apartments

    Planned readiness in 2029.

Building permit BIS-BL-719119-104641. Construction underway.

Buru Kvartāls massing in the Torņakalns context

Site diary

Short notes on what is already done. Factual in tone, without excess promise.

Quarter facade view
  • 06.2026

    Site setup

    Preparing the plot, access roads, and the working area ahead of pile works.

  • 20.07.2026

    Site prepared

    The site was accepted for the next stage. Pile testing followed in July.

  • 07.08.2026

    Pile drilling finished

    The pile field for the phase 1 buildings is complete.

  • 09.2026

    Foundations

    Foundation structures are planned to finish in September.

Site films

Live camera

A real-time view of the site.

Partners

The team behind Buru Kvartāls. Construction, materials, engineering, and sales.

  • RS Arhitekti
  • StudioBooo
  • 3A
  • Starlex Real Estate
  • RIB
  • Brūzis Manufaktūra
  • Riga Veneer
  • Balticom
  • OKEE
  • realto